Kitchen Remodeling Anaheim, CA
City Tile & Cabinets Is Your Local Kitchen Remodeling Contractor.A kitchen remodel is really four decisions made in the right order: layout, cabinets, countertops, then everything that sits around them. Most of the stress people describe comes from making those decisions out of order, or from making them at four different stores.
City Tile & Cabinets has remodeled kitchens out of our showroom on State College Boulevard since 1998. Cabinets, countertop slabs, backsplash tile, and flooring are all under one roof on Tile Row, one mile from Angel Stadium, so you can see them together before anything is ordered. Our own crew handles demolition, cabinet installation, countertop fabrication, tile, and flooring. Plumbing and electrical changes are planned into the same schedule, so you have one point of contact from start to finish.
Start With the House You Have
The age of the home shapes the plan more than the catalog does.
The Anaheim Colony. The historic district downtown follows the boundaries of the original 1857 German colony and covers about 1.8 square miles with more than 1,000 qualifying structures, according to the City of Anaheim. Kitchens in these older homes are often small and closed off, with plaster walls and older wiring. The goal is usually more storage and counter space without losing the house’s character.
West and central neighborhoods. Much of the city was built out in the 1950s and 1960s in single-story ranch tracts. A soffit over the upper cabinets, a wall between the kitchen and family room, and tile counters are the usual starting point. Removing the soffit and running cabinets to the ceiling adds storage without touching the footprint.
Anaheim Hills. Homes from the 1970s through the 1990s tend to have workable layouts with dated finishes: oak or thermofoil cabinets, tile or early granite counters, and a peninsula that could become an island. The budget usually goes into materials rather than moving plumbing.
Condos near the Platinum Triangle. Newer units near Angel Stadium and the Honda Center come with builder-grade finishes. Replacing counters, backsplash, and cabinet fronts while keeping the layout gives the biggest change for the money, and it keeps HOA approvals simple.
Decide in This Order
- Layout. Decide whether plumbing, gas, or walls move. This sets the permit scope, the timeline, and a large share of the budget.
- Cabinets. Stock, semi-custom, or custom; door style; box construction. Custom cabinets can take four to eight weeks, so this decision has the longest lead time. See our kitchen cabinets page.
- Countertops. Choose the slab with the cabinet door in hand. Quartz needs no sealing; granite and quartzite bring natural variation; porcelain slab handles heat and sun. Our kitchen countertops page compares them.
- Sink and faucet. Pick these before templating so the cutout fits exactly. Browse sinks at the showroom.
- Backsplash. Tile or a full-height slab. Choose it against the installed countertop color, not a sample. See custom backsplash tile.
- Flooring and lighting. Porcelain tile and wood-look porcelain handle kitchen spills best. Plan lighting with the cabinet layout.
Where the Budget Goes
Cabinets and countertops are the two largest material costs in most kitchens. Moving plumbing or gas, adding electrical circuits, and removing walls add the most labor. If your cabinet boxes are sound and the layout works, keeping both and replacing doors, counters, backsplash, and hardware changes the look at a fraction of the cost of a full tear-out. We tell you at the measure whether your boxes are worth keeping.
The most common regrets we hear come from small things decided late: an outlet missing from the island, a pantry door that hits the refrigerator, a dishwasher that blocks a drawer when open. Walking the layout with your actual appliance dimensions catches most of them.
How a Kitchen Remodel Runs
- Showroom visit. Bring photos, measurements, and anything you plan to keep.
- In-home measure. We measure and note plumbing, gas, and electrical locations.
- Written scope and estimate. Materials, sequence, and timeline in writing.
- Ordering. Stock cabinets arrive quickly; natural stone slabs are reserved.
- Demo and prep. Old cabinets and counters come out; walls and floors are prepared.
- Install in sequence. Cabinets set and leveled, countertops templated and fabricated in our shop, then backsplash and flooring.
- Walkthrough. Every door, drawer, and seam checked with you.
Countertop and backsplash updates usually take one to two weeks. A full remodel with new cabinets typically runs four to eight weeks of work, plus permits and cabinet lead time.
Permits, Energy Code, and Older Homes
The City of Anaheim’s permit guide lists remodels, moving or replacing plumbing fixtures, and adding or moving outlets and lights as work that needs a permit. Painting and similar finish work does not. We plan the schedule around plan check and inspections.
New permanently installed lighting in a permitted kitchen must meet the California Energy Commission’s Title 24 lighting standards, which in practice means high-efficacy LED fixtures.
Homes built before 1978 may contain lead-based paint. The EPA’s Renovation, Repair and Painting Rule requires any contractor paid to disturb painted surfaces in those homes to be a certified firm using lead-safe practices. That covers the Colony and most mid-century neighborhoods.
Serving Anaheim and Nearby Cities
We remodel kitchens across Anaheim, from the Colony to Anaheim Hills, and in nearby cities including Tustin and Orange. The showroom at 1535 S State College Blvd is 3.5 miles from Disneyland and close to the 5 and 57 freeways. We are open Monday through Friday 8 a.m. to 5 p.m. and Saturday 9 a.m. to 5 p.m.

Do I need a permit for a kitchen remodel?
In most cases, yes. Moving plumbing, adding or moving electrical, and remodeling walls all require a permit in Anaheim. A countertop replacement in place usually does not.
How long does a kitchen remodel take?
Countertop and backsplash updates take one to two weeks. A full remodel with new cabinets typically runs four to eight weeks of work, plus permits and cabinet lead time.
What should I choose first?
Layout, then cabinets, then countertops. Cabinets have the longest lead time, and the countertop should be chosen with the cabinet door in hand.
Can I keep my layout and still get a kitchen that looks new?
Yes. If the cabinet boxes are sound, new doors, counters, backsplash, and hardware change the look for much less than a full replacement.
Who will be working in my home?
Our own crew handles demolition, cabinets, countertops, tile, and flooring. We do not hand the installation to subcontractors.
Can I see everything together before ordering?
Yes. Cabinets, slabs, backsplash tile, and flooring are all in the same showroom.
Plan Your Kitchen Remodel
Visit our showroom at 1535 S State College Blvd, Anaheim, CA 92806, call 714-278-3576, or request a free quote to schedule an in-home measure.
Please contact us for a free at-home consultation.